Check this out! The Pescadero High School CSA-11 Water Line Extension Project is bringing much-needed water upgrades to our school and fire protection system. It’s installing about 1.27 miles of new 6-inch PVC water main, plus 7 new fire hydrants, running between the school and the existing water main at Pescadero Creek Road & Stage Road.
These improvements will help ensure safe drinking water, fire safety, and more reliable infrastructure for students, staff, and the whole community.
Click the link below to see recent updates and a description of the project!